Incorrect result of symbolic equation containig sum(4) operators

Incorrect result of symbolic equation containig sum(4) operators - Messages

#1 Posted: 10/12/2021 11:00:11 AM
Uncas

Uncas

0 likes in 1 posts.

Group: User

Hello everybody!
I am new to the Forum. I am using SMath Studio from time to time and today I have faced a strange problem. I have entered following parameters and equation:
WINWORD_KXbpCZVXMz.png
SMathStudio_Desktop_blQ03rJybR.png
When I calculate the result manually I receive: 71,54 MPa.
I have tried to do it "semi-manually" in SMath Studio calculating separately every part of the equation and I receive also 71,54 MPa:
SMathStudio_Desktop_ZX6VuOuzun.png
Do I make any mistake in vectors ("E", "hp" ) or "Eśr" definition?
I have attached the .sm file.

Thanks in advance for any answers and help!

Posadzka zbrojona wloknem.sm (26 KiB) downloaded 33 time(s).
#2 Posted: 10/12/2021 11:27:06 AM
overlord

overlord

552 likes in 1332 posts.

Group: Moderator

You have made a little mistake over there.
Last part (n-1)/E[n] is written as continuation of your first sum.
If you take the sum part into parenthesis you will get your result.

2021-10-12_17-24.png

Actually you even don't need parenthesis, just put placeholder correctly.

2021-10-12_17-25.png

Regards
  • New Posts New Posts
  • No New Posts No New Posts