Error Highlight not picking up the right 'error' - Сообщения
PileRedux_Factor_CBG.sm (115 КиБ) скачан 152 раз(а).
PileRedux_Factor_CBG.pdf (376 КиБ) скачан 145 раз(а).
Best regards.
Alvaro.
WroteThis is an approach, maybe Jean or Alvaro, can Doctor it
Hello Carlos, maybe like this ... solve(2) to let the solver breath freely.
Cheers ... Jean
PileRedux_Factor_CBG [1].sm (24 КиБ) скачан 146 раз(а).
See attached. I've modified your strip2() algorithm [See Strip3()]. On my PC it performs same calculations ~10x faster. Might help with large data sets.
PileRedux_Factor_CBG [1]_alyles.sm (31 КиБ) скачан 148 раз(а).
WroteHi Jean,
See attached. I've modified your strip2() algorithm [See Strip3()]. On my PC it performs same calculations ~10x faster. Might help with large data sets.
Thanks alyles ... Good job !
WroteHola Carlos. This is another approach.
PileRedux_Factor_CBG.sm (115 КиБ) скачан 152 раз(а).
PileRedux_Factor_CBG.pdf (376 КиБ) скачан 145 раз(а).
Best regards.
Alvaro.
Hola Alvaro.
Gracias
I make the next comment. In none of the 3 graphs that you show,
the scale of the "Y" axis, reaches the value 10, so I think,
it would be necessary to expand the scale to verify that the curves are correct
Best Regards
Carlos
Wrote
Hello Carlos, maybe like this ... solve(2) to let the solver breath freely.
Cheers ... Jean
PileRedux_Factor_CBG [1].sm (24 КиБ) скачан 146 раз(а).
Hello Jean
Thank you so much .
Very pretty
Best Regards
Carlos
WroteI make the next comment. In none of the 3 graphs that you show,
the scale of the "Y" axis, reaches the value 10, so I think,
it would be necessary to expand the scale to verify that the curves are correct
Carlos, the limits are the limits of the solver.
I refactored a bit to understand myself easier,
played a bit the lower limits [A5, A6] ... bingo !
That reminds me how long it toke Mathcad 11 to solve
the Solar Cell project ... let say ~ 1 month.
Cheers ... Jean
Page4 Carlos.sm (29 КиБ) скачан 136 раз(а).
WroteHello Jean
Thank you so much. Very pretty. Best Regards. Carlos
Hola Carlos,
Few more things to improve presentation ...
Decimate part of the A1, A2,A3 . Confirm project is valid
particularly withe 'z' target in A solvers.
Project PileRedux_Factor_CBG [1].sm (30 КиБ) скачан 136 раз(а).
Wrote... I make the next comment. In none of the 3 graphs that you show,
the scale of the "Y" axis, reaches the value 10, so I think,
it would be necessary to expand the scale to verify that the curves are correct
Hola Carlos. Maxima shows 10 for both axis, IPlotSolve, by construction, only can take two vectors (x or y and lambda) but not 3 (x and y and lambda).
For pIPlot and pVField, just change the Box in 'B'. I take columns only one to five.

Best regards.
Alvaro.
WroteHola Carlos,
Few more things to improve presentation ...
... decimated plots are lot more presentable.
At this point, for a specific target solution
easy to get a Thiele analytical formulation.
In the mean time, I will test some decay model.
Cheers ... Jean
Project PileRedux_Factor_CBG [1].sm (46 КиБ) скачан 141 раз(а).
WroteIn the mean time, I will test some decay model.
... a pretty good fit. More models to be explored.
Project PileRedux_Factor_CBG [1] Rational Fit.sm (58 КиБ) скачан 129 раз(а).
Wrote... a pretty good fit. More models to be explored.
... patience is rewarded, an exact fit
considering the inexact solver solutions.
Project PileRedux_Factor_CBG [1] Exact Homographic.sm (50 КиБ) скачан 130 раз(а).
-
Новые сообщения
-
Нет новых сообщений