You actually need a data Excel file, the main sm file, and a snippet. Here they are.
Data file:
MANHATTAN DATA.xlsx (9 KiB) downloaded 15 time(s).Main file with error at 50 steps:
YIELD CALCULATIONS.sm (113 KiB) downloaded 17 time(s). Note, I have set the steps to 10 so it will run for you in in about 15 seconds.. See the pink areas. Set the steps to 50 and the program crashes at 463 seconds with the error I asked about.
Required Snippet:
ALPHA_LAMBDA FOR YIELD CALCULATIONS.sm (65 KiB) downloaded 21 time(s).However, my question has become moot since SMATH is much too slow for these types of complex calculations. To reach the final answer, npoints must = 5000.
Reg