You actually need a data Excel file, the main sm file, and a snippet. Here they are.
Data file:
MANHATTAN DATA.xlsx (9 КиБ) скачан 14 раз(а).Main file with error at 50 steps:
YIELD CALCULATIONS.sm (113 КиБ) скачан 17 раз(а). Note, I have set the steps to 10 so it will run for you in in about 15 seconds.. See the pink areas. Set the steps to 50 and the program crashes at 463 seconds with the error I asked about.
Required Snippet:
ALPHA_LAMBDA FOR YIELD CALCULATIONS.sm (65 КиБ) скачан 20 раз(а).However, my question has become moot since SMATH is much too slow for these types of complex calculations. To reach the final answer, npoints must = 5000.
Reg