1 страниц (6 вхождений)
Colebrook Pipe Data - Colebrook Pipe Data - Сообщения
#1 Опубликовано: 21.04.2016 20:35:32
By same token of "Pipe Data", Colebrook Moody has been refactored.
Observe carefully the code to make the 'solve block' survive by
introducing it within a program structure. In this implicit solve,
the block needs an [one] initial value. Same code structure as
it was discovered in Mathcad 8/11 [undocumented].
A splendid piece of Engineering work for publishing and documenting
the project, tracable for the client's archive.
Jean

Inst_Colebrook MOODY.sm (16 КиБ) скачан 80 раз(а).
Inst_Colebrook Pipe Data.sm (24 КиБ) скачан 81 раз(а).
Observe carefully the code to make the 'solve block' survive by
introducing it within a program structure. In this implicit solve,
the block needs an [one] initial value. Same code structure as
it was discovered in Mathcad 8/11 [undocumented].
A splendid piece of Engineering work for publishing and documenting
the project, tracable for the client's archive.
Jean
Inst_Colebrook MOODY.sm (16 КиБ) скачан 80 раз(а).
Inst_Colebrook Pipe Data.sm (24 КиБ) скачан 81 раз(а).
#2 Опубликовано: 21.04.2016 21:13:44
kW/hr is non-existent (physically nonsensical) unit of power. Power is measured in kW, and work is measured in kW*hr.
С уважением,
Михаил Каганский
#3 Опубликовано: 23.04.2016 01:25:50
WrotekW/hr is non-existent (physically nonsensical) unit of power
Interesting: that's what alll Canadians we pay for 'kWh' consummed.
Billing may vary from Provinces to Provinces
Here is my billing for february 2016
"690 Kwh @ $ 0.0965/kWh"
My kW/hr is user to conform Q[T/hr] to deconfuse unit user confused.
Jean
#4 Опубликовано: 23.04.2016 01:32:22
... typos, updated, on-fly calculator added.
JeanInst_Colebrook Pipe Data.sm (60 КиБ) скачан 58 раз(а).
JeanInst_Colebrook Pipe Data.sm (60 КиБ) скачан 58 раз(а).
#5 Опубликовано: 23.04.2016 03:36:54
WroteInteresting: that's what alll Canadians we pay for 'kWh' consummed.
Billing may vary from Provinces to Provinces
Here is my billing for february 2016
"690 Kwh @ $ 0.0965/kWh"
My kW/hr is user to conform Q[T/hr] to deconfuse unit user confused.
Yes. kWh = kW*hr. This is unit of energy. Energy is integral of power by time, i.e. mean power multiplied by time. Power is measuted in kiloWatts, time in hours.
С уважением,
Михаил Каганский
#6 Опубликовано: 23.04.2016 09:43:20
WroteYes. kWh = kW*hr. This is unit of energy. Energy is integral of power by time, i.e. mean power multiplied by time. Power is measuted in kiloWatts, time in hours.
What you say is right, but not for design Engineer.
The Engineer wants to know the "POWER RATING" of the
motor to push Q[T/hr] via the pump it activates.
That's what the "Pipe Data" answers for those in that stuff.
Just introduce the 'r' efficiency factor from the supplier
of the 'MotorPump'.
1 страниц (6 вхождений)
-
Новые сообщения
-
Нет новых сообщений